# Running Better Staff Meetings & PD (Workshop) > A ready-to-run PD workshop on running staff meetings and PD that respect time and change practice. Run-of-show, handout, follow-up. *A ready-to-run professional learning workshop from K12 Academics. Source page: https://pd.k12academics.com/running-better-pd-workshop.html* Most staff meetings could have been an email, and most PD is forgotten by Monday. Running better staff meetings and PD means protecting people's time: do only what needs doing together, make it active, and plan for what happens after. Good staff meetings and PD respect time: handle information by email, make the live time active and useful, and plan the follow-up that makes it stick. ## Why it works Research on effective professional learning is clear that one-off, passive, sit-and-get sessions rarely change practice, while active, sustained, job-embedded learning does. The same logic applies to meetings: information can be shared asynchronously, and valuable in-person time should be used for work that genuinely needs people together, with a plan for follow-through. **The research:** Learning Forward's Standards for Professional Learning; research on effective PD. ## The run-of-show ### Staff meeting (15 minutes) A fast introduction to plant one routine. **Goal:** everyone leaves with one thing to try. | Start | Length | Segment | What happens | Facilitator note | | --- | --- | --- | --- | --- | | 0:00 | 3 min | Hook | Think of a meeting that wasted your time. What should it have been? Name it. | You are surfacing the time cost. | | 0:03 | 5 min | Mini-teach | Email the info, make live time active, follow up. One slide. | | | 0:08 | 5 min | Plan one | Name what to cut from a coming agenda. Turn and talk. | | | 0:13 | 2 min | Commit | Each leader names one thing to move to email. | | ### PLC / team meeting (45 minutes) The standard version. **Goal:** every teacher leaves with something designed for a real upcoming lesson. | Start | Length | Segment | What happens | Facilitator note | | --- | --- | --- | --- | --- | | 0:00 | 5 min | Hook | Sit-and-get PD vs active, followed-up PD. Which changed your practice? | Let them feel why PD fails. | | 0:05 | 8 min | Mini-teach | What effective professional learning requires. | | | 0:13 | 12 min | See it in action | Look at an active session design. What would I change? | Model the practices. | | 0:25 | 12 min | Design | Redesign a real meeting or PD session. | Protect the full time. | | 0:37 | 5 min | Share | Swap plans in pairs; add a follow-up step. | Keep it in pairs. | | 0:42 | 3 min | Commit + follow-up | Lock it in and set the follow-up. | | ### Half-day institute (~3 hours) A deep session for a PD day. **Goal:** built, practiced, and a rollout planned. | Start | Length | Segment | What happens | Facilitator note | | --- | --- | --- | --- | --- | | Block 1 | 45 min | Experience + why | Wasted time, then effective PD research. | | | | 15 min | Break | | | | Block 2 | 60 min | Redesign sessions | Leaders redesign upcoming meetings and PD. | Share active structures. | | Block 3 | 45 min | Practice | Run a short active segment for peers. | Modeling is the move. | | Close | 15 min | Plan the rollout | Adopt the email-first rule; set follow-ups. | | ## The core activity: redesign one meeting or PD session Leaders leave having redesigned a real session to respect time, stay active, and be followed up. - Take an upcoming staff meeting or PD session. - Move everything that is just information into an email or shared doc. - Design the remaining live time to be active: discussion, practice, problem-solving. - Plan the follow-up that will make it stick. ## Facilitator notes - Cut information-sharing from live time. - Make it active, and model the practices you want teachers to use. - Always plan the follow-up. ## Adapt it - **Elementary and secondary:** the same principles. - **Whole-staff vs team:** scale the activity accordingly. - **All settings:** active and followed up. ## Participant handout One page for every teacher. Print it, or save it as a PDF. ### Running Better PD: respect time, make it active **Protect the time:** information by email, active live time, and follow-up that makes it stick. - The meeting or PD session: __________ - What I will move to email or a doc: __________ - How I make the live time active: __________ - The follow-up that makes it stick: __________ - How I protect the time: __________ ## Make it stick Active and followed up: - Send information in writing. - Make live time active, and follow it up. - Bring a redesigned session that landed to the leadership team. ## Common questions **Could this meeting have been an email?** Often, yes. Information-sharing belongs in writing. Save the meeting for discussion, decisions, practice, and problem-solving that need people together. **Why does most one-off PD fail?** Because it is passive and not followed up. Learning changes practice when it is active, applied, and revisited, not delivered once and dropped. **How do I make PD stick?** Make it active, tie it to a real next step, and build in follow-up, a check-in or a share-back, so the learning is used, not just heard. ## Go deeper - [Learning Forward](https://learningforward.org) ## Build it into a bigger day - [Facilitating Effective PLCs](https://pd.k12academics.com/facilitating-plcs-workshop.html) - [Instructional Coaching Cycles](https://pd.k12academics.com/instructional-coaching-cycles-workshop.html) - [Learning Walks & Peer Observation](https://pd.k12academics.com/learning-walks-peer-observation-workshop.html) --- Full workshop page: https://pd.k12academics.com/running-better-pd-workshop.html All workshops: https://pd.k12academics.com/